Blackwall Tunnel

Vessels
Location: Worldwide
Contract Value: £85,000
Scope: To supply and commission an addressable heat detection system to protect vessel

Kings Cross Station

Eggborough Power Station

Westland Horticulture Bark Plant

Luzern Cold Storage Depot
Location: TBC
Contract Value: £TBC
Scope: TBC
TBC

Waldau – Wernhalde Rail And Subway Tunnels And Marshalling Tunnels
Location: TBC
Contract Value: £TBC
Scope: TBC
TBC

BASF Bect Conveyor System
Location: TBC
Contract Value: £TBC
Scope: TBC
TBC

PPL Power Station Cable Trays
Location: TBC
Contract Value: £TBC
Scope: TBC
TBC

Autom Parking Tower
Location: TBC
Contract Value: £TBC
Scope: TBC
TBC

Lundby Tunnel
Location: TBC
Contract Value: £TBC
Scope: TBC
TBC

Lancaster Tunnel
Location: TBC
Contract Value: £TBC
Scope: TBC
TBC

General Installation Guide

Details
- The area being protected was 70m x 35m with an apex roof.
- The sensor cable clamps were secured on the roof purlins at 750mm intervals using self-drill tex screws.
- 400m SEC15 sensor cable was then installed within 4 hours once the clamps were installed.
- 2 x connections boxes located within 25cm of the SCU800 controller (Connection boxes and SCU800 controller was fixed to a concrete wall at low level.
- Time taken to install complete system 48 man hours.